Twenty Years: Work Continued Outside and Inside | November 2002

 

Amy and Amanda load scraps from work inside the church.

Work Continues - Outside and Inside

In November the parking lot was graded and the two islands built. Hanging the vinyl siding was competed. Concrete pads were put in for the HVAC units.

Inside the church the transformation was dramatic as wallboard was put up. Our members put up the wallboard in the nonpublic areas, such as attic and utility room. A professional crew put up the wallboard in the public areas. The insulation work was also completed.